翻訳と辞書
Words near each other
・ Casearia mannii
・ Casearia mauritiana
・ Casearia megacarpa
・ Casearia mexiae
・ Casearia quinduensis
・ Casearia sylvestris
・ Casearia tinifolia
・ Casearia williamsiana
・ Casearia wynadensis
・ Caseasauria
・ Casebook
・ Casebook (disambiguation)
・ Casebook (video game)
・ Casebook method
・ Casebook of the Black Widowers
Casecnan Dam
・ Casecnan Protected Landscape
・ CaseComplete
・ CaseCruzer
・ Casefabre
・ Casegoods
・ Casei Gerola
・ Casei River
・ Caseidae
・ Casein
・ Casein kinase
・ Casein kinase 1
・ Casein kinase 1 isoform epsilon
・ Casein kinase 1, alpha 1
・ Casein kinase 2


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Casecnan Dam : ウィキペディア英語版
Casecnan Dam

Casecnan Irrigation and Hydroelectric Plant is a dam diverting water from the Casecnan and Taan Rivers to the Pantabangan Reservoir through a long tunnel located near Pantabangan and Muñoz in Nueva Ecija province of the Philippines. The multi-purpose dam provides water for irrigation and hydroelectric power generation while its reservoir affords flood control. It was considered one of the most expensive hydroelectric plants built in the country,〔(【引用サイトリンク】url=http://www.jcmiras.net/surge/p171.htm )〕 being next only to San Roque Dam.
The Casecnan Irrigation and Power Generation Project is also located in Rizal, Nueva Ecija. The P6.75-B Project provides irrigation to 26,920 hectares of new farms in the Science City of Munoz, Talugtog, Guimba, Cuyapo, and Nampicuan, all of Nueva Ecija. It genenerates 140 megawatts of power for the Luzon grid that will supply cheap electricity to millions of people in Luzon including Metro Manila.()()
==History==
In August 1987, former President Corazon Aquino signed Executive Order 136, which provides for the establishment of a Watershed Forest Reserve out of the Casecnan River. The reserve covered an area of .〔 By May 1993, former President Fidel Ramos sought out investors to fund the Casecnan Phased Transbasin Project. It became one of the flagship programs of the Ramos government and by 1995, the Casecnan Project got approved for construction.〔 In September 2001, former President Gloria Macapagal Arroyo finally opened the diversion tunnel after two years after the Phase I of the Casecnan project was done.〔 In 2012, the Aquino government approved the construction of the second phase of the Casecnan project.〔

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Casecnan Dam」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.